Andreas Wibowo


Full Name          : Prof. (R) Dr. Ing. Habil. Andreas Wibowo, S.T., M.T.
Email address   : andreas_wibowo@unpar.ac.id

EDUCATION

  • Bachelor Degree:
    Civil Engineering, Institut Teknologi Bandung (1990 –1995)
  • Master Degree:
    Civil Engineering, Institut Teknologi Bandung (1996 –1998)
  • Doctor Degree:
    Civil Engineering, Technische Universitaet Berlin (2001 –2005)
  • Habilitation Degree:
    Civil Engineering, Bauhaus Universitaet Weimar(2011–2016)

RESEARCH INTERESTS

Public-private partnership; risk management; financial engineering; cost management; project planning and controlling; project management; project finance; construction economics; public procurement; decision-making theories.

TAUGHT COURSES

  1. Construction project scheduling (bachelor’s program)
  2. Final project (bachelor’s program)
  3. Construction cost estimation (master’s program)
  4. Decision-making theories in construction (master’s program)
  5. Risk management (master’s program)
  6. Urban water management in developing countries (master’s program)
  7. Cost management (master’s program)
  8. Thesis (master’s program)
  9. Advanced project management (doctoral program)
  10. Dissertation (doctoral program)

RECENT ACADEMIC PUBLICATIONS
International Journal (all publications)

  1. Wibowo, A., Sundermeier, M. (2020). “Developing a Fuzzy Value-for-Money Analysis Model for Annuity-Based Public-Private Partnership Infrastructure Projects under Consideration of Risk Mitigation Capability.” ASCE Journal of Construction Engineering and Management, Vol. 146, No.7.
  2. Wibowo, A. (2019). “Determining Reasonable Bid Ratios under Two-sided Power Distribution Assumption for Public Procurement under Capped Lowest-Cost Bidding System.” International Journal of Procurement Management, Vol. 12, No. 2, 177–198.
  3. Sihombing, L., Latief, Y., Rarasati, A.D., Wibowo, A. (2018). “Utilizing Uncertainty Management to Analyze the Uncertainty of Toll Road Land Acquisition.” International Journal of Civil Engineering and Technology, Vol. 9, No. 6, 1221–1228.
  4. Sihombing, L., Latief, Y., Rarasati, A.D., Wibowo, A. (2018). “Developing a Toll Road Financing Model with a Hybrid of Deep Discount Project Bonds and Land Leases in Indonesia.” International Journal of Civil Engineering and Technology, Vol. 9, No. 6, 1310–1323.
  5. Sihombing, L., Latief, Y., Rarasati, A.D., Wibowo, A. (2018). “Project Financing Models for Toll Road Investment: A State-of-the-art Literature Review.” Civil Engineering and Architecture, Vol. 6, No. 3, 115–127.
  6. Soepandji, B.S., Sihombing, L., Latief, Y., Rarasati, A.D., Wibowo, A. (2018). “Hybrid Model of Deep Discount Project Bonds and Land Leases for New Toll Road Projects in Indonesia.” International Journal of Civil Engineering and Technology, Vol. 9, No. 4, 563–569.
  7. Latief, Y., Sihombing, L., Rarasati, A.D., Wibowo, A. (2017). “The Financial Model of Land Lease Improving Toll Road Development: a Delphi Survey and Critical Success Evaluation.” Journal of Engineering and Applied Sciences, Vol. 12, No. 7, 1790–1794.
  8. Wibowo, A., Alfen, H.W. (2015). “Predicting the Probability of Default for Municipal Water Utilities in Indonesia.” Public Works Management & Policy, Vol. 20, No. 4, 337–359.
  9. Wibowo, A., Alfen, H.W. (2015). “Benchmarking the Efficiency of Municipal Water Utilities in Indonesia using Stackelberg Data Envelopment Analysis.” Benchmarking: An International Journal, Vol. 22, No. 4, 588–609.
  10. Wibowo, A., Alfen, H.W. (2015). “Government-led Critical Success Factors in PPP Infrastructure Development.” Built, Environment and Project Asset Management, Vol. 5, No. 1, 121–134.
  11. Wibowo, A., Alfen, H.W. (2014). “Identifying Macro–Environmental Critical Success Factors and Key Areas for Improvement to Promote Public-Private Partnerships in Infrastructure: Indonesia’s Perspective.” Engineering, Construction and Architectural Management, Vol. 21, No. 4, 338–402.
  12. Wibowo, A., Alfen, H.W. (2013). “Fine–tunning the Value and Cost of Capital of Risky PPP Infrastructure Projects.” Engineering, Construction and Architectural Management, Vol. 20, No. 4, 406–419.
  13. Latief, Y., Wibowo, A., Iswara, W. (2013). “Preliminary Cost Estimation using Regression Analysis Incorporated with Adaptive Neuro-Fuzzy Inference System.” International Journal of Technology (IJ–Tech), Vol. 1, 63–72.
  14. Wibowo, A., Permana, A., Kochendoerfer, B., Tiong, R.L.K, Jacob, D., Neunzehn, D. (2012). “Modeling Contingent Liabilities arising from Government Guarantees in Indonesian BOT/PPP Toll Roads.” ASCE Journal of Construction Engineering and Management, Vol. 138, No. 2, 1403–1410.
  15. Santoso, J.S., Yuwono, T.B., Santosa, W., Wibowo, A., Sinaga, H. (2012). “Public-Private– Partnerships of Tollway Construction and Operation: Risk Assessment and Allocation from the Perspective of Investors.” Journal of Construction in Developing Countries, Vol 17, No.2, 41–62.
  16. Wibowo, A., Kochendoerfer, B. (2011). “Selecting BOT/PPP Infrastructure Projects for Government Guarantee Portfolio under Conditions of Budget and Risk in the Indonesian Context.” ASCE Journal of Construction Engineering and Management, Vol. 137, No. 7, 512–522.
  17. Wibowo, A., Mohamed, S. (2010). “Risk Criticality and Allocation in Privatised Water Supply Projects in Indonesia.” International Journal of Project Management, Vol. 28, No. 5, 504–513.
  18. Wibowo, A. (2008). “Discussion of Float Consumption Impact on Cost and Schedule in the Construction Industry.” ASCE Journal of Construction Engineering and Management, Vol. 134, No. 10, 828–829.
  19. Wibowo, A. (2006). “CAPM–Based Valuation of Financial Government Supports to Infeasible and Risky Private Infrastructure Project.” ASCE Journal of Construction Engineering and Management, Vol. 132, No.3, 239–248.
  20. Wibowo, A., Kochendoerfer, B. (2005). “Financial Risk Analysis of Project Finance in the Indonesian Toll Roads.” ASCE Journal of Construction Engineering and Management, Vol. 131, No. 9, 963–972.
  21. Wibowo, A. (2005). “Discussion of Concessionaire Selection: Methods and Criteria by Xueqing Zhang.” ASCE Journal of Construction Engineering and Management, Vol. 131, No. 7, 854–856.
  22. Wibowo, A. (2005). “Estimating General Threshold Traffic Level of Typical BOT Toll Road Projects in Indonesia.” Construction Management and Economics, Vol. 23, No. 6, 621–630.
  23. Wibowo, A. (2004). “Discussion of Optimal Capital Structure Model for BOT Power Projects in Turkey by Sandalkhan Bakatjan, Metin Arikan, and Robert L.K. Tiong.” ASCE Journal of Construction Engineering and Management, Vol. 131, No. 3, 385–386.
  24. Wibowo, A. (2004). “Valuing Guarantees in a BOT Infrastructure Project.” Engineering, Construction and Architectural Management, Vol. 11, No. 6, 395–403.

International Seminar (2015 – 2020)

  1. Utama, W.P., Wibowo, A., Jumas, D.Y., Rita, E., Yulcherlina. (2020). “Risk allocation of PPP waste to energy projects in Indonesia: A research framework.” IOP Conference Series: Materials Science and Engineering, Vol. 930, 012023.
  2. Mahani, I., Tamin, R.Z., Pribadi, K.S., Wibowo, A. (2019). “The Risks of Construction Grant Support in Toll Road Investment Faced by Indonesia’s Government.” MATEC Web of Conference, Vol. 270, 05001.
  3. Sihombing, L., Adiwijaya, A.J.S., Wibowo, A. (2018). “Public-Private-People-Partnership as a New Financing Model for Infrastructure Development: A Conceptual Framework.” Proceedings of the 7th. Engineering International Conference on Education, Concept, Application on Green Technology, Vol. 1: EIC, 195–197.
  4. Mahani, I., Tamin, R.Z., Pribadi, K.S., Wibowo, A. (2017). “Evaluation of Implementation Viability Gap Fund (VGF) Policy on Toll Road Investment in Indonesia.” AIP Conference Proceedings, Vol. 1903, 070013-1–070013-6.
  5. Wibowo, A., Taufik, J. (2017). “Developing a Self-assessment Model of Risk Management Maturity for Client Organizations of Public Construction Projects: Indonesian Context.” Procedia Engineering, Vol. 171, 274–281.
  6. Rarasati, A., Sihombing, L, Wibowo, A., Latief, Y. (2016). “The New Toll Road Financing Model Determination.” Proceedings of the Third Australasia and South-East Asia Structural Engineering and Construction Conference Kuching, Sarawak, Malaysia, Oct 31-Nov 4, 2016.
  7. Wibowo, A. (2015). “Returns to Scale in Buildings Construction Costs: Indonesian Cases.” Procedia Engineering, Vol. 125, 18–24.

RECENT COMMUNITY SERVICE ACTIVITIES (2015-2020)

  1. Resource person for Preparation of PPP Agreement for Regional Water Supply Karian-Serpong Project (Ministry of Public Works and Housing), 2020.
  2. Resource person for Preliminary Study Preparation of Garangkong and Pangkal Balam Port Projects (PT Ditori Geokarya Teknik), 2020.
  3. Resource person for Technical Assistance for Settlements Investment (Ministry of Public Works and Housing), 2020.
  4. Resource person for Workshops in Preparing Good Infrastructure Projects (Coordinating Ministry for Economic Affairs), 2020.
  5. Resource person for Workshops in Optimizing Creative Financing for Infrastructure Provision (PKNSekolah Tinggi Akuntansi Negara), 2020.
  6. Jury member of The Falling Walls Lab Jakarta Competition (Deutscher Akademischer Austausch Dienst), 2020.
  7. External evaluator for Research and Development Final Reports (Ministry of Public Works and Housing), 2020.
  8. Resource person for Workshops in Preparing Technical Guidance for Concession Investment Viability of Special and Self-Use Ports (Ministry of Transportation), 2019.
  9. Resource person for Capacity Building for Monitoring Fiscal Risk (Ministry of Finance), 2018.
  10. Resource person for Workshops in PPP Housing Provisions for Low Income Groups (National Development Planning Agency), 2018.
  11. Resource person for Workshops in Implementing PPP Models in Indonesian Infrastructure Provision (PT Junalindo Aksara Grafika), 2018.
  12. Resource person for Developing Curriculum and Training Materials for Government Officials (Ministry of Public Works and Housing), 2017.
  13. External evaluator for Final Research and Development Report (Indonesian National Government Internal Auditor), 2017.
  14. Resource person for Workshops in Preparing Infrastructure Facilities for Experimental Nuclear Reactor Project in Puspitek Serpong (National Nuclear Energy Agency of Indonesia) 2016.
  15. Resource person for Workshops in Scientific Writings for Functional Government Officials (Ministry of Public Works and Housing), 2016.
  16. Resource person for Focus Group Discussion of PPP Models for Bandara Soetta Railway Project (Ministry of Transporation), 2016.
  17. Resource person for Advisory and Consultancy Management Supports (Indonesian Infrastructure Guarantee Fund), 2015.
  18. Resource person for Developing Capacity Building Materials for Local Governments in Managing Infrastructure Risks (Ministry of Public Works and Housing), 2015.

RECEIVED RESEARCH GRANT OR FUNDING

  1. Alexander von Humboldt Reinvitation Fellowship, Jun.–Jul. 2018.
  2. Georg Forster for Experienced Researchers Fellowship, Jul.–Sep. 2011, May–Aug. 2013, Oct. 2013– Feb. 2014.
  3. Deutscher Akademischer Austauschdienst (DAAD) Reinvitation Fellowship, Oct.–Nov. 2009.
  4. Deutscher Akademischer Austauschdienst (DAAD) Doctoral Scholarship, Oct. 2001–May. 2005.
  5. Australia–Indonesia Governance Research Project (AIGRP) Fellowship Batch 1, Apr. 2007–Dec. 2007 (partnered with Prof. Dr. Sherif Mohamed, Griffith University Australia).
  6. World Bank–University Research Graduate Education (URGE) Master Scholarship, Oct. 1996– Apr. 1998.

NATIONAL AND INTERNATIONAL NETWORKING/MEMBERSHIPS

  1. Indonesian Researchers Association (2019–present)
  2. German Engineers Association (2004–2018)
X